All the parts from the front pin block have been cleaned and repaired, and so it is time to reinstall them.

The springs have been placed on all the regular air pins. The Unit Shift actuator has no spring of its own; instead it relies on the spring of the drawbar pivot.

The cover has been put in place, screwed down and dowelled into its proper position. At this point I tested that all the air pins operated properly when fed compressed air.

The matrix jaws have been dropped in place and the shoe that guides them has been secured. What are those numbers? I’ll describe that in another post.
Leave a Reply